Forum

Üzgünüz, yorum formu şimdilik kapalı.

Climbprotec Safe Climbing System First Time Installation Completed in Turkey

Ozen Consultant  had a lot of  introduction about Climbprotec  safe climbing with fixed rail system  as  Turkey agency. Advantages...

Kayseray Phase 2. & 3. Tender is Finalized

Kayseri and Kayseri Metropolitan Municipality public transportation is the most important projects of the ground-breaking Kayseray’ın Phase 2 and...

Auction was held of BursaRay Kestel Phase 3 (East Line)

BursaRay Kestel Phase 3 (East Line)  designed by  Bursa Metropolitan Municipality.  This project intend to set up  light rail...

Bursa Tram and light rail train manufacturing

Ozen Technical Consultant will give  education about production of the tram and metro wagons which was started by Bursa Metropolitan...

Ankara High Speed ​​Train Station Tender was postponed

Ankara High Speed ​​Train Station Tender was postponed to 2 March 2011 by   Directorate General of TCDD. General Directorate...

Consultancy for cable car new Bursa Uludag

Agreement was signed by between  Ozen technical  Consultant  and Şentürkler Engineering  Construction AŞ   about consultancy for new cable car ...

Safe Climbing Climbprotec Turkey

A new product for safe climb with fixed rail has been entering the Turkey  market by the agency of  Ozen...

Libyan Sirt-Benghazi High-Speed ​​Train Project, Technical Consulting

Employer :   Libyan Arab Railways Date of Contract  : 21.10.2009 Description of Work : Arrangement of works , laying and erection...

BursaRay Stage II

Employer:  Bursa Metropolitan Municipality Date of Contract : 28.10.2008 Description of Work :  Extension of the west line of...

About Ozen Technical Consultant

Ozen Technical Consultant established to provide professional technical consulting services  in  rail systems which  is  rapidly growing market ....